The Add sequence step adds a sequence to the stream. A sequence is an ever-changing integer value with a specific start and increment value. You can either use a database sequence to determine the value of the sequence, or have it generated by Kettle.
On this page of the site you can watch the video online Pentaho Data Integration (PDI) - Tutorial 3 - Add a sequence - Basic example with a duration of hours minute second in good quality, which was uploaded by the user IAmEarlyBird 05 July 2017, share the link with friends and acquaintances, this video has already been watched 9,414 times on youtube and it was liked by 30 viewers. Enjoy your viewing!